Replacement of machinery in small engine rooms where the access to devices is difficult is a challenge for professionals.
Public utility buildings are places with particular technical conditions. Very small machine rooms, very difficult conditions of equipment dismantling and assembly, very limited access, the lack of repairs downtime.
DESCRIPTION OF THE SCOPE OF PERFORMED MODERNIZING WORK
Replacement of ice water circulating pumps with pre-designing hydraulic connections:
Dismantling worn pumps Grundfos CLM 150-261-15.0 and CLM-200-315-45.0.
Dismantling of compensators.
Dismantling concrete foundation with disposal.
Prefabrication of new concrete foundation.
Assembly of prefabricated foundations anti-vibration mats Regufoam Vibration 220.
Unification of suction and discharge pipelines.
Assembly of new pumps Grundfos TP 150-240/4 A-F-A DBUE 18,5kW , TP 200-380/4 A-F-A DBUE 45kW 400VD.
Execution of thermal insulation in Armaflex rubber technology.
Commissioning the pumps and measurement of efficiency of the installation.
![]()
![]()
![]()
![]()
![]()